Office Decoration Contract
Office decoration contract
The owner (hereinafter referred to as Party A): Telephone:
The construction team (hereinafter referred to as Party B): Telephone:
Party A and Party B, in a friendly and cooperative manner, have signed the following contracts in an equal and impartial manner in accordance with the relevant laws of the contract law and other related laws.
I. engineering survey
Project address:
Two, price
The cost of cleaning work: $, capital.
Among them, hydropower engineering yuan
Wood working yuan
Tile work yuan
Painter yuan
Garbage collection fee
Three. Payment method
1, construction team entering, advance living expenses: 1000 yuan.
2, carpenter finished, pay 1000 yuan.
3. The bricklayer is finished, paying 1000 yuan.
4, the completion of the project, pay 1800 yuan.
5, the warranty payment is 400 yuan, 1 years from the date of completion.
Four, design
1. If Party A has drawings, Party B shall furnish Party B with a set of drawings and be responsible for making the conclusion.
2. If Party A has no drawings, Party B shall give clear instructions to Party B. Party B shall draw sketches before Party A's approval.
Five. Materials
1, Party B shall provide Party A with a list of materials to be purchased 3 days in advance. Party A shall purchase materials in time for the construction team within 4 days, and both parties shall bear their respective responsibility for the delay and the economic losses.
2. Without Party A's consent, Party B shall not purchase materials on its own. If purchased, Party A has the right to refuse to use it unconditionally and refuse to pay the cost of the material.
3, Party B shall purchase materials at the building material supply point designated by Party A and issue official invoices.
4, Party B should check the quality of the materials purchased by Party A and find that the quality problems should be submitted to Party A in a timely manner and have the right to refuse to use them.
If Party A persists in using it, Party B shall be required in writing and bear the losses caused by the material quality.
5 Party B shall collect the goods for Party A. check the accuracy of the quantity and parts.
6, Party B should keep good material storage and prohibit the entry of idle people into the construction site.
7, Party B shall ensure that there are no double and half package works in this district.
8, Party B should do well in the finished product protection.
9, without Party A's permission, Party B shall not carry any building materials out of the house. If such phenomena are found, it will be doubled from the labor cost according to the price of the materials.
Six. Construction period
From the date of the month of 2004 to the date of the 2004 day of the month, the time limit for the construction is scheduled to be postponed. Due to the delay of the first party's factor and the delay of the construction period, Party A may deduct the labour cost of Party B 50 yuan per day because of the delay of the construction period due to Party B's factors.
Seven. Material handling
Party A's material is sent to the downstairs of the site of the project, and any construction worker of Party B shall be pported unconditionally.
Eight, garbage disposal
1. Garbage bagging.
2, garbage should be cleaned daily.
3, garbage should be pported to the designated refuse disposal place by the property.
Nine. Labor management
1. Party B shall provide Party A with copies of the identity cards of all construction personnel before commencement of work.
2, without the permission of Party A, the non site builders shall not spend the night at the construction site.
3, Party A shall promptly handle Party B's access documents and pay related expenses for Party B.
4, Party B shall have all the documents that are temporarily lodging in Shanghai, and the relevant losses arising from incomplete documents shall be borne by Party B.
5. Party B is designated as the person in charge of the construction site and the person in charge of the replacement.
6. In the contract price, Party B shall provide people with the following materials.
7, Party B shall not arbitrarily change the construction personnel without Party A's consent. Every day, the construction site must maintain 2 (1 persons) or more construction personnel.
8, without Party A's consent, Party B shall not stop or work under any circumstances.
Ten. Construction machinery and equipment
1, Party B has the necessary tools for construction and guarantees the safety and good usability of the tools.
2, the consumables (such as drill bits, saw blades, etc.) produced by the tools will be borne by both Party A and Party B.
Eleven. Site management
1, the scene prohibited the use of open flames.
2. Smoking is prohibited at the scene.
3, paint materials must be placed separately from other materials.
Twelve, maintenance
1. Due to the quality problems caused by Party B's construction cause, Party B shall repair it without compensation within two years.
2, general maintenance party B shall repair in time within three days after Party A notifies Party B. In special cases (water and electricity), Party B must arrive and maintain within 24 hours.
3, if Party B fails to complete the repair in time, Party A can arrange other construction teams to carry out maintenance work. The labor cost incurred will be deducted from the warranty.
Thirteen. Contract annex
1. List of construction projects.
2. Mutually acceptable quotations.
3. A list of materials purchased by Party B.
Fourteen. Contract disputes
1, there are disputes.
2, negotiation can not bring litigation to the court where the dispute is located.
Fifteen, decoration requirements
A. decoration process
"Circuit installation technology requirements:
1, when the circuit is installed, products with qualified certificates must be used.
2, three line installation must use three different color labels.
In principle, red, yellow, blue, and fire line color labels.
Blue, green and white are zero line color labels, black, yellow green color lines are grounding color labels.
3, all conductors must be installed in the corresponding PVC pipe and buried in the well with a depth of 4 x 3cm. If the side line is chipped, the construction of other works can not be affected. If necessary, the problems in construction can be solved through consultation with the wood and tile workers.
4, all lines must be distributed vertically and horizontally. Spider web distribution is strictly prohibited.
PVC pipe must be put into the main switch box about 3cm, and then along the wall, along the ground vertical distribution, the turning point is connected with 90 degrees elbow or hose, and fixed with the pipe clip.
All conductors can not have joints in PVC pipes.
5. The diameter of the buried wire is calculated according to the power of the electric appliance. The air conditioning, bathing, electric water heaters and refrigerator lines must be put in place from the switch box.
6. The length of all buried conductors at the junction box is 20cm. The wire box must be firmly sealed with cement mortar, and it should be kept upright. It should not be skewed. Its fit should be slightly lower than 0.5cm of the wall.
The size of the main switchgear can be determined by the number of customers' wires.
7. After all wires are distributed correctly, the electricity test can be carried out. The method is to connect all the electrical connectors to the 15W bulb of the lamp holder and turn on the power supply. If the light is fully lit, the circuit installation of the household is basically qualified, then the project pfer order can be filled out.
Please sign the acceptance of other workers, and the electrical concealment works will be concluded.
8. Install all kinds of luminaires and switch panels, three days before the paint is about to be removed, or the last time the paint is finished.
Approach
The top of the chandelier must be fixed with 4 x 3cm wood with expanded wire. Then the chandelier will be fixed on the wood side.
The panel installation of all switches must be straight and not skewed.
When the ceiling lamp is installed, the fixed wire must be cut on the wooden edge, and it must not be cut on the buckle plate.
9, telephone lines and cable lines must not be in line with a wire in a PVC tube.
"Watercraft installation requirements:
1, the use of 6 sub water pipes or aluminum plastic composite pipe, must be tested factory qualified products.
2. During the construction process, all the connecting bolts of the pipeline must be wrapped up in linen and white paint, and tightened up. According to the horizontal and vertical distribution, if the ground pipeline crosses, the secondary pipe must be installed under the main pipe to maintain the overall water pipe distribution on a horizontal line.
3, the water pipes through the balcony must be buried in the floor of the raw wool floor or the chisel 4cm deep in the wall, and then sealed with the cement mortar.
4. After the pipeline is in place, the pipe card must be used.
Turning place
There is a place where the taps can be clamped tightly without loosening.
5, all water outlets must be installed with water pipes and floor drain. The pipes of PVC pipes must be covered with special PVC glue.
Attention should also be paid to the 6 hour static solidification when the horizontal drop is connected to the main drain pipe embedded in the raw wool housing.
6, if the main drain pipe embedded in the raw wool house is not used or not ideal, it can also re lay holes in the floor according to the actual situation, and seal the pipes around the floor with new fireproof glue. The new sealed place will use a cement mortar to encircles a high 10mm circle. After being solidified for 58 hours, the circle will be filled with water. After 24 hours, it can be seen downstairs to see whether there is any seepage around the new pipe.
If not, it is proved that the new piping is qualified, otherwise, it needs to be reprocessed, and then do the water penetration test until it is qualified.
Brush the wall 1 before washing the walls, scrape off the water putty from the wall and roof, and do the sticker treatment.
2 times 108 glue two times putty once again primer two times topcoat ceiling.
3 pay attention to the amount of water required for latex paint.
4 every painting on the wall is required to be checked by the householder.
The door door sleeve 1. dismantling the original door frame and the core board substrate.
Beech plank
Veneer, beech solid wood door line.
The width of the door is not more than 55mm, and the thickness is less than 10mm.
2. paint: polyester varnish 3 times.
3 use a bandage or kraft paper bag between the wall and the door.
Acceptance criteria for package door and dumb
1 it is required to be horizontal and vertical. It is equal to 1mm within 2 meters. The chamfering of each workpiece is 1 * 45 degrees.
2 plumbing on the door cover to check perpendicularity.
The door is pressed by 1. multi-storey boards, sealed, and the plate has a shape (the door size is not larger than 1000mm 2000mm).
2. paint: polyester varnish 3 times.
3. when the door is wrapped, there will be a lot of nail holes. First, brush the wood with varnish once more, then let the oil worker repair the nail eye, then rub the putty. The putty should be scraped for at least two times until the surface is smooth and smooth. After scraping, sandpaper can be used to spray paint.
- Related reading
- Company news | The First One To Set Up Factories In The United States, How Did This Cotton Leading Enterprise Fare Under The Trade Friction?
- News Republic | The Number Of Gap Brands In China Has Reached 200 Breakthroughs For The First Time.
- neust fashion | Milk Tea Air Jordan 4 "Mushroom" Will Be On Sale Soon!
- Fashion shoes | Nike Air Max 97 Shoes New "Green Glow" Color Matching Release
- Fashion brand | Alfa Industrial X EVISUKURO 2019 Joint Series Is About To Debut, Uniform Street.
- Expert commentary | After The Mid Autumn Festival, The Purchase Price Of New Cotton Rises Everywhere To Boost The New Cotton Market.
- Expert commentary | Dye Prices Rose Again, Polyester Raw Materials Decline In The "Golden Nine Silver Ten" Market Is Not Promising.
- Daily headlines | "I Haven'T Been So Happy For Many Years!" See How Honghe Stirred Up The "Initial Heart" Of The Sweater.
- Daily headlines | Saudi Arabia Gives A Timetable For Resumption Of Production. Demand Is Not Strong, PTA And MEG Are Beginning To Shiver.
- Fashion shoes | New Hundred Lun X Bodega Joint Shoes New "No Bad Days" Color Matching Landing At The End Of The Month
- The Rising Of The Shoe Material Makes The Price Of The Shoe Deterred By The Price Of The Shoe
- New Oriental Yu Minhong: I Am Dragged On.
- Family Decoration Contract
- ACRONYM公布2010秋冬季系列图集
- German Brand ACRONYM Street Fashion Style New Products
- Celebrities Support Daphne'S FACE Charity Activities
- Italy'S Top Fashion Brand Prada2010 New Package
- Luxury Brand Prada New Camouflage&Nbsp; Backpack
- China Consumes More Than Half Of The World's Fur &Nbsp; &Nbsp; Fur Consumption Is Controversial.
- Jiang Yiyan Attended Her Hometown'S Yellow Rice Wine Festival And Sang "Daughter Red".